Entrusted by the tenderee, the EPC general contracting project for the desulfurization and low pressure economizer reconstruction project of the #4 furnace of Huadian Longkou Power Generation Co., Ltd. is subject to public competitive bidding information, and the bid applicants that meet the application conditions of this bid and are willing to participate can Participate in bidding.
First, the tender method: open tender / qualification review
Second, the tender segmentation and tender content:
A total of bids for this tender:
Huadian Longkou Power Generation Co., Ltd. #4 furnace desulfurization low-pressure economizer design and supply, installation, performance test of heating surface and its headers, soda water connection pipes, valves, expansion joints, flue guards and thermal insulation sheet Wait.
For details, see the bidding documents.
III. Project Overview:
1. Project name: EPC general contracting for the desulfurization and low pressure economizer renovation project of #4 furnace of Huadian Longkou Power Generation Co., Ltd.
2. Project Scale: Ibid.
3, the current scale: ibid.
4. Construction address: Longkou City, Shandong Province.
5. Investors and Investment Ratio: Self-raised.
Fourth, qualification requirements:
The bidder shall have the ability to fully perform the contract in terms of technology, business, finance, and organization, and shall have the ability to perform the contract satisfactorily in terms of personnel, equipment, funds, etc. The specific conditions shall meet the following conditions:
1. Must be registered in the People's Republic of China and have independent legal personality, registered capital of 50 million yuan and above, with the right to sign contracts independently;
2. Qualification requirements of the enterprise: The bidder shall have the Qualification level above the general contract for the procurement of construction and procurement awarded by the State Construction Administration Department, and shall have an effective safety production license.
3. The bidding party has achieved at least 8 sets of heat exchangers for domestic side 200MW and above units in the past five years, and provided an effective copy of the contract; the format of the performance should conform to the performance list format in Chapter 3 (additional columns can be added). , otherwise deemed invalid. If there is more performance, please list all the same performance in the performance list.
4. The bidder must have a sound quality management system, environmental management system, occupational health and safety management system certification, or equivalent quality assurance system certification and annual inspection records and within the validity period.
5. Has good business reputation and a sound financial accounting system, with good financial auditing status;
6. The Huadian Group has a good reputation. There are no major quality problems in the construction process undertaken in the past three years, and no serious personal injury or fatal accident occurred. It is not a contractor listed on the “black list†of Huadian Shandong Branch.
7. With good bank credit and business reputation, not being ordered to suspend business and assets being taken over, frozen or bankruptcy;
8, this bid does not allow the Commonwealth bid.
9. Special requirements: In view of the actual situation of the project, the bidder shall promise that the design work within the scope of this bid shall be entrusted to the unit with the qualification of class B and above of the design of mining and recruitment project; the equipment within the scope of this bid section. Should be entrusted by the unit with a special equipment manufacturing license (A class boiler parts) to undertake. The above fee is included in the total quote.
Special note: The bidder shall ensure that all the qualification documents provided must be true and valid, and ensure that the relevant documents and documents during the execution period of the contract are valid. Once a false document or content is found, no matter how tiny, the bid solicitor may cancel its qualifications for bidding and reserves the right to obtain corresponding compensation.
VIII. Announcement:
1. Time: November 15, 2016 to November 20, 2016
IX. Submission of tender application:
1. Application Form: Please fill in the form according to the bulletin attached to the bulletin. All items should be filled in in detail. The result of the applicant's unclear and incomplete entry due to the Bid Application shall be borne by the applicant.
2. Submission method and bidding fee: The bidding fee shall be RMB 1000 yuan. The bidder shall scan and send the bidding document remittance base bill and the “Tender Application†separately to the project manager’s mailbox. The email title is “Longkou Economizer- - Abbreviation of the bidder unit, and at the same time call to confirm. (Note: The bid fee must be remitted from the bidder’s unit account, otherwise the bid invitation agent cannot issue an invoice for the bid fee, as the result of the individual remittance will be borne by the bidder themselves)
3. Submission time: November 15, 2016 to November 20, 2016.
4. Transmission of correspondences:
1 The mailbox provided in the application should be unique (the applicant uses this email to send and receive documents).
2 After the letter is clearly scanned (JPG picture format), it will be sent and received using the e-mail address provided in the application. The title of the e-mail will be briefly marked with “Longkou Economizer×× items - abbreviation of the bidder†to prevent mail from being found or lost.
3 The original correspondence of the application, etc. Please keep it and submit it when opening the bid.
Tenth, the tender documents for sale:
1. The bid solicitor will receive the bidder’s tender fee remittance form and the scanned copy of the “Tender Application Form†and send the electronic version of the tender document to the email address provided by the bidder’s application form. If you have not received the bidding documents for a long time due to unknown reasons such as the internet, please contact us by phone or send us an email again.
Please read the bidding documents as soon as possible. If you find that there are ambiguities, contradictions, multiple meanings, etc., please submit a clarification application before the time specified in the bidding documents. After scanning, send it to the person in charge of the project. Economizer clarification application - abbreviation of the application unit and call to confirm).
2. Time of sale: From November 15, 2016 to November 21, 2016.
XI. Opening time:
1. Opening time: 9:30 am on December 7, 2016 (tentative)
Contact: Qian Yong
Mobile:
phone
fax
E-mail:
In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.
Perkins 76-200KW Diesel Generator
Perkins 76-200Kw Diesel Generator,Perkins Silent Type Diesel Generator,Perkins Container Type Diesel Generator,Perkins Super Silent Diesel Generator
Shanghai Kosta Electric Co., Ltd. , https://www.generatorksd.com