Dongfeng Road Lighting Reconstruction Engineering Construction Professional Contract Tender Notice


Tender No.: No tendering agent: Guangzhou Dongkong Engineering Project Management Co., Ltd. Owner: Guangdong Power Grid Corporation Guangzhou Power Supply Bureau Street Light Management Office Registration Deadline: 2010-01-07
Region: Guangdong Industry: Water Conservancy Bridge Construction

Approved according to the text of Suifa Reform City [2009] No. 96 and Sui Jian Ji Letter [2009] No. 2303, and the project has the construction drawing review document and proof of funds, the Guangdong Power Grid Corporation Guangzhou Power Supply Bureau Street Light Management Office is now on the street lights of 2009. Reconstruction Project - Dongfeng Road Lighting Reconstruction Project is engaged in construction contracting for public bidding, and the contractor is selected.
I. Project Name: 2009 Street Light Reconstruction Project - Dongfeng Road Lighting Reconstruction Project Construction Professional Contract 2. Bidding Unit: Guangdong Power Grid Corporation Guangzhou Power Supply Bureau Street Light Management Office Contact: Miss Du Telephone Tendering Agency: Guangzhou Dongkong Project Management Contact person of the company: Miss Huang Telephone Tendering Supervision Agency: Guangzhou Construction Project Tendering Management Office Complaints Telephone No. 3, Construction Location: Dongfeng Road, Guangzhou City.
4. Project Overview: The road lighting project construction and installation of the power supply voltage level is 10KV transmission line.
V. Classification of tenders and the contents, scale and estimated price of bidding for each tender:
1. The project is divided into a tender section.
2. The bidding content, scale and estimated bid price of each bidding section:
Item Number: 2009-6320
Content and scale of the tender: The construction and installation of the road lighting project with the power supply voltage level of 10KV transmission line shall be subject to the drawings and engineering quantity list provided by the tenderer.
Estimated contract price: 1401.008153 million yuan, source of funds:: urban construction funds VII, the announcement of the tender announcement time:
From 8:00 on December 18, 2009 to 16:00 on January 6, 2010.
Note: The time for issuing the tender notice is from the date of the issuance of the tender notice to the deadline for submission of the tender.
8. Time for submitting bid documents and time for bid opening
1. Time for submitting bid documents (on the day of submission of bid documents): January 6th, 2010, from 10:00 to 12:00.
2. Bid Opening Time: 9:30 on January 7, 2010 to 17:00 on January 7, 2010.
3. Whether there is any change in the deadline for bidding and the time of bid opening, please pay close attention to the relevant information in the bidding and answering questions.
IX. Procedures for Bidding Registration Bidders will go through the bidding formalities at Room 202, 2nd Floor, Guangzhou Construction Engineering Trading Center (333 Tianrun Road, Tianhe District, Guangzhou) before the deadline for submission of bids.
1. The bidder shall submit the bidding documents with the following information:
(1) The original of the legal representative certificate, the original certificate of the authorized representative of the legal representative (provided when the representative of the illegal representative is present), and the original identity card of the person;
(2) "Guangzhou Construction Project Bidding Information Sheet".
2. Bid guarantee and bid registration fee:
(1) The bidding guarantee is 10,000 yuan, and the bidding registration fee is 100 yuan/standard section;
(2) The bidding guarantee and registration fee can be paid on-site at the time of submitting the bidding documents, or can be paid by means of “online banking” payment or annual deposit. The bid guarantee and registration fee must be paid before the bid opening.
(3) From the day of submitting the bidding documents, the bidder may obtain the invoice for the registration fee from the Guangzhou Construction Engineering Trading Center with the “Guangzhou Construction Project Payment Form”.
3. The use status of the project leader shall be submitted according to the deadline for submitting the bid documents. The information recorded in the enterprise database of the Guangzhou Construction Engineering Trading Center shall prevail. If the person responsible for the project is unable to be used, the bid information cannot be entered into the Guangzhou Construction Engineering Trading Center. For the transaction service system, the bid documents are reviewed by the bid evaluation committee for discarding.
X. Qualification review method:
1. This project adopts the post-qualification method and implements the e-qualification examination.
XI. Eligibility requirements for bidders:
1. The bidder’s intention to participate in the bidding is clearly expressed, and the bidder’s representative is authorized to be effective.
2. The bidders are all qualified as independent legal persons and hold the business license of the legal person issued by the administrative department for industry and commerce, and operate according to national laws.
3. (1) The bidders hold the enterprise qualification certificate and safety production license issued by the construction administrative department.
4. The bidder has the qualifications required to undertake the project (one of the following):
(1) City and road lighting engineering professional contracting level 2 (or above);
(2) Three-level (or above) contractor for power transmission and transformation engineering;
(3) Mechanical and electrical equipment installation engineering professional contracting level 2;
5. (1) The bidder intends to be the person in charge of the project is a registered construction engineer at the municipal public engineering level, and holds the project manager safety training assessment certificate (Class B); (Note: the bidder holds the city And road lighting engineering professional contractor level 2 (or above) qualification selection)
(2) The person who the bidder intends to be the person in charge of the project is a registered construction engineer of the second or higher level of the power engineering or mechanical and electrical engineering profession, or has the qualification of the small project leader in accordance with the provisions of Sui Building [2008] No. 309. And hold the project manager safety training assessment certificate (Class B); (Note: the bidder holds the subcontracting engineering professional contractor level 3 (or above) qualification to choose this)
(3) The bidder intends to be the person in charge of the project is a registered construction engineer of the second level of mechanical and electrical installation engineering or mechanical and electrical engineering, and holds the project manager safety training assessment certificate (Class B); (Note: the bidder holds Mechanical and electrical equipment installation professional contracting level 1 qualification selection)
Note: The professional and grade standards of the constructor are in accordance with the “Registration of Construction Engineers (Trial)” and “Standards for Registered Construction Engineers (Trial)”.
6, 2 clear construction site residual mud and soil transportation and discharge administrator by the construction professional contractor full-time security officer (with construction safety assessment certificate C) concurrently (applicable to construction professional contract bidding and no construction general contractor project).
7. The bidder has completed the quality-qualified similar project performance in Guangzhou area since December 1, 2007 (nearly 2 years or more) (similar projects refer to the lower level of qualification level mentioned in point 4). Engineering, the level of qualification required for the bidding project is already at the lowest level, and performance requirements must not be set). It is necessary to provide the notice of winning the bid, the construction contract, the completion acceptance report or the completion acceptance certificate (the construction price is subject to the notice of winning the bid). If the above information cannot prove the technical indicators of the scale of performance (referred to as area, height, span, pipe diameter, etc.), additional information indicating the technical indicators of performance shall be provided. (Optional terms. Local bidding projects shall be subject to the performance of Guangzhou, and non-local bidding projects may be determined by the tenderee)
Note: (1) The notice of winning the bid should be confirmed by the following units: Guangzhou Construction Engineering Trading Center and its branch, former Guangdong Construction Engineering Trading Center, former Guangzhou Construction Engineering Trading Center, and former Guangzhou Panyu District Construction Engineering Trading Center (Tendering Center), the former bidding management office of Huadu District Construction Project in Guangzhou, the former Guangzhou Economic and Technological Development Zone Construction Engineering Trading Center, and the Conghua Construction Engineering Trading Center and Zengcheng Construction Engineering Trading Center.
(2) For the professional project performance of individual bidding, it is necessary to provide the bidding notice, construction contract, completion acceptance report or completion acceptance certificate. The performance of professional projects subcontracted by the general contractor shall be provided only with the notice of winning the bid of the general contractor (copy), the subcontract confirmed by the owner and the general contractor, the completion acceptance report or the completion acceptance certificate.
8. The bidder has signed the “Bidder's Declaration” in accordance with the specified format and content requirements.
9. About the joint bid:
(2) This project does not allow consortium bidding.
10. Before the qualification examination, the informant and the informative filing information of the bidder and the person in charge of the project have been published on the Guangzhou City Construction Network.
Note: The information on the qualification conditions of the second, third, fourth, fifth and seventh bidders is taken from the information registered by the bidder in the enterprise database of the Guangzhou Construction Engineering Trading Center. The information recorded in the enterprise library will be regarded as the bid applicant. Submit part of the eligibility review information. The evaluation by the Bid Evaluation Committee on this part of the information will be based on the information recorded in the enterprise database of the Guangzhou Construction Engineering Trading Center at 12 noon on the opening day. The bidder shall promptly maintain the information in Annex II to ensure that the information is within the validity period.
12. The official bidder's qualification review shall be determined by the bid evaluation committee established by the tenderer according to law. The official bidder must be a qualified bidder.
13. When the tender notice is published online, the bidding documents, construction drawings and bidding control price shall be issued at the same time. The time for preparing the bidding documents shall be calculated from the date of the issuance of the bidding announcement, and the time for preparing the bidding documents shall not be less than 20 days.
If the tenderer needs to issue a supplementary announcement, the time for preparing the tender documents shall be calculated from the time of the last supplementary announcement, and it shall be clearly stated in the bidding and answering questions.
14. If the number of bidders who meet the eligibility criteria for qualification examination is less than 5 or the number of bidders that are valid for review is less than 3, the bidding will fail. The tenderer analyzes the reasons for the failure of the bidding, amends the bidding plan, and re-organizes the bidding after being reported to the relevant management department for approval.
If the tenderer fails to apply for a change in bidding or fails to tender due to two or more bidding failures, the final public bidding shall cancel the qualifications of the bidder's performance.
XVI. This project is in accordance with the “Notice on Forwarding the “Maximum Value Method for the Establishment of Bidding and Tendering of Building Construction and Municipal Infrastructure Projects by the Guangdong Provincial Construction Department” (Sui Building [2006] No. 539) and the National Standard of the People's Republic of China GB50500-2008 "Construction Engineering Quantity List Valuation Specification" sets the bidding control price.
17. The bidding unit may sign a complaint with the bidding supervision agency of this bidding for any illegal and unfair content in this announcement and the bidding documents.
18. The tender notice document and the bidding documents use the GZZB200612-017-2 bidding documents. The differences between this announcement and the contents of the template are underlined. All underlined parts are part of this announcement and have the same effect as other parts.
20. This project is an electronic bid evaluation. The bid documents will not accept paper documents, and the bidders will be required to submit electronic bid documents with legal effect. To this end, the bidder shall have the ability to electronically sign the electronic bidding documents using an electronic signature certificate issued by a legally established electronic certification service provider (Guangdong Digital Certificate Certification Center (GDCA)). The bidder can go to the Guangdong Digital Construction Certification Center to set up an electronic signature certificate at the agent office of the Guangzhou Construction Engineering Trading Center. The preparation of the electronic bidding documents shall use the tender document management software of V1.1.1.2.
Twenty-one, the acquisition of the bidding drawings can be downloaded from the website of the Guangzhou Construction Engineering Trading Center to enter the member area to download.

60V Charger

HuiZhou Superpower Technology Co.,Ltd. , https://www.spchargers.com

Posted on